Site contaminantion investigation and Remediation

Projects

Location: Central Uganda


Client: Confidential

Service: Environment and  Biodiversity


Site contaminantion investigation and Remediation

Underground storage tanks (USTs) are used for storing fuel, but they can pose a risk if they develop leaks. Leakage from USTs can result in soil and groundwater contamination, presenting environmental and health concerns. Eco and Partner undertook a thorough site investigation is crucial to confirm the presence of leakage from these underground tank at a fuel station in Central Uganda.

Site investigations involved a systematic process of assessing and evaluating the condition of UST, as well as the surrounding soil and groundwater, to determine if leakage has occurred and to what extent, allowing for appropriate remediation measures to be implemented.

Soil samples were collected from specific locations around the USTs to determine if petroleum hydrocarbons or other contaminants are present. These samples were analyzed in an accredited laboratory to quantify the concentrations of contaminants, to determine the potential severity of the leakage and the extent of soil contamination.

Site investigations involved the use of specialized techniques and equipment, such as soil vapor surveys or geophysical surveys.

    COMPANY

    Plot No.16A Ntinda II Road,
    P.O. Box 23989, Kampala, Uganda
    +256 319291830


      Environmental Social Consutltancy MTN

      Location: Uganda


      Client: MTN Uganda

      Service: Environmental and social consultancy


      Base Transceiver Stations

      MTN Uganda is the largest telecommunication company in Uganda with 15 million subscribers, accounting for 53 percent market share.

      Base Transceiver Station is a piece of equipment that facilitates wireless communication between user equipment (UE) and a network. UEs are devices like mobile phones (handsets), and computers with wireless Internet connectivity. The deployment by operators is to improve service delivery in the region.
      Eco & Partner provided Environmental and social consultancy services to the developer, including Resettlement Action Plans (RAPs), ESIAs, Environmental Compliance Auditing and Monitoring for Mobile Telecommunication Base Transceiver Station in various parts of Uganda.

        COMPANY

        Plot No.16A Ntinda II Road,
        P.O. Box 23989, Kampala, Uganda
        +256 319291830


          ESIA for Exploration Areas 1, 1A, 2 and 3A

          Location:Buliisa, Hoima and Kikuube Districts.


          Client: Tullow Uganda limited

          Service: Environmental and social consultancy


          Exploration Areas 1, 1A, 2 and 3A

          Tullow entered into three Ugandan exploration licenses in 2004 following the acquisition of Energy Africa. The acreage presented Tullow with a great opportunity to explore across this vast and relatively undrilled onshore basin. In 2006, Tullow began to get encouraging exploration results and flow tests from some initial wells. Further significant discoveries and appraisal success led in 2009 to the basin development commercial volume threshold being exceeded.

          The Group added further equity and operatorship to the licenses in the Lake Albert Rift Basin when it acquired Hardman Resources in 2007.

          The company has provided Environmental and social consultancy services to the developer encompassing the following:

          • ESIA for Kigogole Field Appraisal drilling for Exploration Area 2 in Buliisa district
          • ESIA for Kigogole-Nsoga 3D seismic Survey for Exploration Area 1 & 2 Buliisa district
          • ESIA for Kasemene-Ngiri 3D Seismic Survey for Exploration Area 1& 2 Buliisa district
          • ESIA for Nsoga-C appraisal drilling for Exploration Area 2 Buliisa district.
          • ESIA for Kigogole-4 Appraisal Drilling for Exploration Area 2 Buliisa district
          • Environmental Audit of Ngege base camp for Exploration Area 2 Buliisa district.
          • ESIA for Nsoga-5 Appraisal drilling for Exploration Area 2 Buliisa district.

            COMPANY

            Plot No.16A Ntinda II Road,
            P.O. Box 23989, Kampala, Uganda
            +256 319291830


              Human Rights Impact Assesment – Tilenga Project

              Location: Uganda


              Client: TotalEnergies Uganda Limited

              Service: Social Consultancy


              Human Rights Impact Analysis Study

              The purpose of Human Rights Due Diligence was to identify and address potential and actual adverse impacts with which a company is involved directly or through its business relationships.

              Conducting Human Rights Due Diligence focuses a company’s attention on its responsibility to respect Human Rights and ensures that a company manages risk to people, and not just risk to business. Compliance with national law may not be sufficient, where there is a conflict between legal standards and TEPU’s commitment to respect international Human Rights. TEPU seeks to honor the principles of internationally recognized Human Rights to the greatest extent possible in the circumstance.

                COMPANY

                Plot No.16A Ntinda II Road,
                P.O. Box 23989, Kampala, Uganda
                +256 319291830


                  Kyambura Small Hydro Power Project

                  Location: Rubirizi district


                  Client: GET-Fit Uganda Program

                  Service: Environment and Social Consultancy


                  Kyambura Small Hydro Power Project

                  The Kyambura Small hydro power is located on the Kyambura River in Rubiziri District in South-western Uganda. The key project structures comprise a concrete flow diversion weir and intake, pebble basin for flushing coarse river bed material, 2.7 km headrace canal, incorporating a settling basin tank, forebay, 0.95 km of penstock, and a surface power station. The power station will be equipped with two Francis generating units with a combined installed capacity of 7.6 MW and an estimated energy output of 36.7 GWh/ per year.

                  Eco and Partner provided Environmental and Social Consultancy services including:  reconnaissance visits, preparation of the scoping report and terms of reference, and quality control for preparation of the ESIS. The ESIA was prepared in accordance with Ugandan environmental legislation and international best practice embedded in the IFC sustainability framework.

                    COMPANY

                    Plot No.16A Ntinda II Road,
                    P.O. Box 23989, Kampala, Uganda
                    +256 319291830