SHEQ Commitment

SHEQ Commitment

At Eco & Partner we care about the health and safety of our people, our business partners and contractors, and our clients. Caring is quite simply at the core of our culture. We make it a priority every hour of the day to ensure our people are working and living in a way that keeps them, their families and their communities safe and healthy. We extend this caring to our contractors, vendors and clients in every project we undertake. We are committed to promote and maintain SHEQ responsible practices for the benefit of our employees, stakeholders and interested parties where we operate.

The commitment to the SHEQ Policy provides the foundation for a safe workplace, environmental sustainability and long-term business success in all our activities, products and services we offer. Management achieves this commitment by providing a safe and healthy work environment, meeting Customers’ requirements with a highly effective SHEQ management system that focuses on establishing, implementing and continuously improving an Integrated Management System based on ISO 9001: 2015, 14001: 2015 and 45001: 2018 Standards. Our committement won us the award for the HSE Contractor of the Year 2021 for medium Risk Companies. The Award was based on compliance to HSE requirements and Total recordable incident rate (TRIR).

Related

At Eco & Partner we care about the health and safety of our people, our business partners and contractors, and our clients. Caring is quite simply at the core of our culture. We make it a priority every hour of the day to ensure our people are working and living in a way that keeps them, their families and their communities safe and healthy. We extend this caring to our contractors, vendors and clients in every project we undertake. We are committed to promote and maintain SHEQ responsible practices for the benefit of our employees, stakeholders and interested parties where we operate.

The commitment to the SHEQ Policy provides the foundation for a safe workplace, environmental sustainability and long-term business success in all our activities, products and services we offer. Management achieves this commitment by providing a safe and healthy work environment, meeting Customers’ requirements with a highly effective SHEQ management system that focuses on establishing, implementing and continuously improving an Integrated Management System based on ISO 9001: 2015, 14001: 2015 and 45001: 2018 Standards.
Our committement won us the award for the HSE Contractor of the Year 2021 for medium Risk Companies. The Award was based on compliance to HSE requirements and Total recordable incident rate (TRIR).  

    COMPANY

    Plot No.16A Ntinda II Road,
    P.O. Box 23989, Kampala, Uganda
    +256 319291830


      Our commitment to Sustainability

      Our commitment to Sustainability

      Eco & Partner is committed to promoting sustainable communities and responsible development by embedding the principles of sustainability into project planning, design, execution, and operation, and by delivering products and services for sustainable development. Moreover, we are committed to conducting our business and operations in a manner that has a positive impact on the communities in which we live and work.
      Our sustainability relies on using resources prudently, reducing our environmental footprint, and supporting a better quality of life for people around the world.

      Eco & Partner is committed to promoting sustainable communities and responsible development by embedding the principles of sustainability into project planning, design, execution, and operation, and by delivering products and services for sustainable development. Moreover, we are committed to conducting our business and operations in a manner that has a positive impact on the communities in which we live and work.

      Our sustainability relies on using resources prudently, reducing our environmental footprint, and supporting a better quality of life for people around the world.

        COMPANY

        Plot No.16A Ntinda II Road,
        P.O. Box 23989, Kampala, Uganda
        +256 319291830


          Environmental Compliance Auditing for the Critical Oil Roads

          Environmental Compliance Auditing for the Critical Oil Roads

          Location: Uganda


          Client: Uganda National Roads Authority

          Service: Environmental and social consultancy


          UNRA has a mandate to develop and maintain the national roads network, advise Government on general roads policy and contribute to addressing of transport concerns.

          Eco has provided environmental and social consultancy services including but not limited to:
          Environmental and Social Compliance Auditing of various projects implemented by the developer:
          ⦁ Masindi (Kisinja) – Park Junction and Tangi Junction – Para – Buliisa (159 Km).
          ⦁ Para Bridge, which is composed of 13 spans each at 40m and bridge deck of 15.95m wide.
          ⦁ The Buhimba-Nalweyo-Bulamagi and Bulamagi-Igayaza-Kakumiro roads (93km)

            COMPANY

            Plot No.16A Ntinda II Road,
            P.O. Box 23989, Kampala, Uganda
            +256 319291830


              Tilenga project

              Location: Uganda


              Client:TotalEnergies Exploration and Production Uganda Ltd

              Service: Environmental and social consultancy


              Tilenga project

              Tilenga: located in the Buliisa and Nwoya districts in the Lake Albert, the Tilenga project is operated by Total Energies (56.6%), in partnership with CNOOC and UNOC. It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids (oil, water, gas. All of the water produced will be reinjected into the fields and the gas will be used to produce the energy needed for the treatment process. Surplus electricity will be exported to the pipeline and the Ugandan grid.

              One of the fields developed is located inside Murchison Falls Park. The others are located outside the park, south of the Victoria Nile in sparsely populated rural areas and activities that are essentially agricultural.

              Eco & Partner has provided Environmental and Social Consultancy services to the developer encompassing the following:

              • Development of the Tilenga Project Environmental Social Impact Assessment. The various studies carried out during the preparation of the ESIA including: Air quality and climate change; noise and vibration; geology and soils; hydrogeology; surface water; landscape and visual; waste; Ecological and biological environment: Terrestrial vegetation; terrestrial wildlife; aquatic life; and Social-economic environment: archaeology and cultural heritage; health and safety; ecosystem services, Stakeholder engagement was performed as part of the social impact assessment. Unplanned events, cumulative impacts, and transboundary impacts were also assessed, in addition to providing an Environmental and Social Management Plan.
              • Health Safety and Environment Compliance Auditing for the Tilenga Project Facilities and Activities including well pads, Airstrip’s, camps, Industrial Area, Access Roads etc.
              • Environment Monitoring of the project Activities and Facilities.
              • Social performance through provision of Transitional Support (Distribution of Dry Rations) for RAP 2-5.
              • Eco-toxicological studies for plants around Purongo Waste Consolidation Area.
              • Environmental and Social Impact Assessment for additional Project Components and facilities including the Nile Crossing, Tilenga Additional Borrow Pits, and Workers Camps.
              • Tilenga Project Human Rights Impact Assessment.
              • Tilenga Project Induced In-Migration (Influx Studies).

                COMPANY

                Plot No.16A Ntinda II Road,
                P.O. Box 23989, Kampala, Uganda
                +256 319291830


                  Kyambura Small Hydro Power Project

                  Kyambura Small Hydro Power Project

                  Location: Uganda


                  Client: Uganda National Roads Authority

                  Service: Environmental and social consultancy


                  The Kyambura Small hydro power is located on the Kyambura River in Rubiziri District in South-western Uganda. The key project structures comprise a concrete flow diversion weir and intake, pebble basin for flushing coarse river bed material, 2.7 km headrace canal, incorporating a settling basin tank, forebay, 0.95 km of penstock, and a surface power station. The power station will be equipped with two Francis generating units with a combined installed capacity of 7.6 MW and an estimated energy output of 36.7 GWh/ per year.

                  Eco and Partner provided Environmental and Social Consultancy services including: reconnaissance visits, preparation of the scoping report and terms of reference, and quality control for preparation of the ESIS. The ESIA was prepared in accordance with Ugandan environmental legislation and international best practice embedded in the IFC sustainability framework.