Tilenga project

Tilenga: located in the Buliisa and Nwoya districts in the Lake Albert, the Tilenga project is operated by Total Energies (56.6%), in partnership with CNOOC and UNOC. It includes the development of six fields and the drilling of around 400 wells from 31 locations. Production will be delivered through buried pipelines to a treatment plant built in Kasenyi, for the separation and treatment of the fluids (oil, water, gas. All of the water produced will be reinjected into the fields and the gas will be used to produce the energy needed for the treatment process. Surplus electricity will be exported to the pipeline and the Ugandan grid.

One of the fields developed is located inside Murchison Falls Park. The others are located outside the park, south of the Victoria Nile in sparsely populated rural areas and activities that are essentially agricultural.

Eco & Partner has provided Environmental and Social Consultancy services to the developer encompassing the following:

  • Development of the Tilenga Project Environmental Social Impact Assessment. The various studies carried out during the preparation of the ESIA including: Air quality and climate change; noise and vibration; geology and soils; hydrogeology; surface water; landscape and visual; waste; Ecological and biological environment: Terrestrial vegetation; terrestrial wildlife; aquatic life; and Social-economic environment: archaeology and cultural heritage; health and safety; ecosystem services, Stakeholder engagement was performed as part of the social impact assessment. Unplanned events, cumulative impacts, and transboundary impacts were also assessed, in addition to providing an Environmental and Social Management Plan.
  • Health Safety and Environment Compliance Auditing for the Tilenga Project Facilities and Activities including well pads, Airstrip’s, camps, Industrial Area, Access Roads etc.
  • Environment Monitoring of the project Activities and Facilities.
  • Social performance through provision of Transitional Support (Distribution of Dry Rations) for RAP 2-5.
  • Eco-toxicological studies for plants around Purongo Waste Consolidation Area.
  • Environmental and Social Impact Assessment for additional Project Components and facilities including the Nile Crossing, Tilenga Additional Borrow Pits, and Workers Camps.
  • Tilenga Project Human Rights Impact Assessment.
  • Tilenga Project Induced In-Migration (Influx Studies).

    COMPANY

    Plot No.16A Ntinda II Road,
    P.O. Box 23989, Kampala, Uganda
    +256 319291830


      Environmental Compliance Auditing for the Critical Oil Roads

      Environmental Compliance Auditing for the Critical Oil Roads

      Location: Uganda


      Client: Uganda National Roads Authority

      Service: Environmental and social consultancy


      UNRA has a mandate to develop and maintain the national roads network, advise Government on general roads policy and contribute to addressing of transport concerns.

      Eco has provided environmental and social consultancy services including but not limited to:
      Environmental and Social Compliance Auditing of various projects implemented by the developer:
      ⦁ Masindi (Kisinja) – Park Junction and Tangi Junction – Para – Buliisa (159 Km).
      ⦁ Para Bridge, which is composed of 13 spans each at 40m and bridge deck of 15.95m wide.
      ⦁ The Buhimba-Nalweyo-Bulamagi and Bulamagi-Igayaza-Kakumiro roads (93km)

        COMPANY

        Plot No.16A Ntinda II Road,
        P.O. Box 23989, Kampala, Uganda
        +256 319291830


          Kingfisher Development Area

          Kingfisher Development Area

          Location: Uganda


          Client:CNOOC Uganda Limited

          Service: Environmental and social consultancy


          The Kingfisher Project is planned to develop the Kingfisher, Mputa, Nzizi and Waraga fields. The Project will produce 40,000 Barrels of Oil per day during peak production. The crude will be treated at a Central Processing Facility (CPF) located in the south-eastern shores of Lake Albert. The Kingfisher development wells will be highly deviated wells from onshore surface locations targeting the offshore reservoir.

          Eco & Partner has provided Environmental and Social Consultancy services to the developer encompassing the following:

          • Services for Environmental and Social Impact Assessment (ESIA)and Public Hearing for the Kingfisher ESIA Report. ESIA for development of the Kingfisher field in EA-3. Subsurface construction includes a total of 40 wells (27production wells and 13 injection wells); the surface construction will include well-pads, production flow lines and water injection flow lines, an oil export pipeline, a central processing facility, a lake water extraction station, camps, a jetty, an airstrip and roads
          • Invertebrates (Mud Snail) Baseline Investigation Study. The study was undertake based on IFC performance standard 6 requirements. This thought to verify presence of mud snails (an endangered species) in the near-shore habitats off the Buhuka Flats. The study area covered; the Bugoma Lagoon (33.2 ha), large bays (73.7 ha), open sandy shores (554.8 ha) and shallow river associated water (37.2 ha), totaling approximately 699 ha.
          • Critical species study at Kingfisher oilfield (Nahan Francolin, Grey Crown Crane, Eastern Chimpanzee)
          • Environmental Compliance Audit for CNOOC Uganda Facilities in Kingfisher Development Area, Transportation, Treatment and Disposal of Kingfisher drilling waste, Access Roads etc.

            COMPANY

            Plot No.16A Ntinda II Road,
            P.O. Box 23989, Kampala, Uganda
            +256 319291830


              Exploration Area-2 and License Area 2

              Exploration Area-2 and License Area 2

              Location: Kampala-Uganda
              Client: Uganda National Roads Authority

              Service: Environmental and social consultancy

              Tullow entered into three Ugandan exploration licenses in 2004 following the acquisition of Energy Africa. The acreage presented Tullow with a great opportunity to explore across this vast and relatively undrilled onshore basin. In 2006, Tullow began to get encouraging exploration results and flow tests from some initial wells. Further significant discoveries and appraisal success led in 2009 to the basin development commercial volume threshold being exceeded.

              The Group added further equity and operatorship to the licenses in the Lake Albert Rift Basin when it acquired Hardman Resources in 2007.

              The company has provided Environmental and social consultancy services to the Tullow Uganda Operations PTY Ltd encompassing the following:

              • Environmental and Social Impact assessment the Proposed North Development Project in EA-1/EA-1A and EA-2 – Total E&P Uganda and Tullow Uganda Operations Pty bench marked on IFC Performance Standards.
              • Environmental Audit for License Area 2 Facilities in Buliisa, Kikuube and Hoima Districts.
              • Environmental Monitoring and Handover of Restored Sites in License Area 2.
              • Project Brief for Waraga-D Appraisal Drilling (Exploration Area 2), Hoima District
              • Ngiri Field Appraisal Drilling, EA-1 (South Nile) in Buliisa District
              • Environmental Social Impact Assessment for Kigogole Field Appraisal Drilling, EA-2 North in Buliisa District
              • Environmental Social Impact Assessment for Kigogole-Nsoga 3D Seismic Survey, EA-2 North in Buliisa District
              • Environmental Social Impact Assessment for Kasemene-Ngiri 3D Seismic Survey, EA-2 North and EA-1 South Nile in Buliisa District
              • Environmental Social Impact Assessment for Nsoga-C Appraisal Drilling, EA- 2 North in Buliisa District
              • Environmental Social Impact Assessment for Kigogole-4 Appraisal Drilling, EA-2 North in Buliisa District
              • Environmental Social Impact Assessment for Nsoga-5 Appraisal Drilling in Buliisa District
              • Environmental Social Impact Assessment for Plugging and Abandonment of Karuka-1, Karuka-2 and Taitai-1A Wells, Buliisa District
              • Environmental Social Impact Assessment for Ngiri-F Appraisal Well, EA-1 (South Nile) in Buliisa District
              • Environmental Social Impact Assessment for ESIA for Kigogole Field Appraisal drilling for Exploration Area 2 in Buliisa district

              Transport and Mobility

              Sector

              Transport and Mobility

              As populations grow, so do demands for safe, expedient and cost-effective transportation. We work with clients around the world to build, modernize and expand transportation projects that carry all of our communities into the future safely and reliably.

              Eco & Partner Consult Limited is nationally recognized for the wide range of health & safety, environmental, and permitting services that we provide for our nation’s infrastructure. Through integration of our service capabilities, we offer a broad technical approach to technical issues and provide cost-effective and technically appropriate solutions to complex challenges while mitigating risks associated with the Environment Health and Safety. We use our extensive knowledge to integrate Environmental and Social concerns in designing and managing transportation systems as well as find smarter, more advanced ways to move people across cities and countries. Our integrated approach and social responsibility have earned us the trust of local municipalities, government agencies, commercial clients and public-private partnerships. Our expertise and global reach enable us to deliver high-quality solutions for our clients that pave the way for long-lasting benefits to society. Some of the services we provide include;
              • Environmental and Social impact Assessment and Permitting
              • Environmental Compliance Auditing
              • Compensation and Resettlement Action Plans
              • Air quality and Green House Gas assessment
              • HSE Management and Compliance